Busbar systems
250+ supply, maintenance and installation projects
A selection of sites, not a complete list. Systems of any brand, 800 to 3200 A, in banks, malls, hotels, government towers and residential developments across Doha.
Rectification · supplyViva Bahriya Tower 3 — The Pearl1600 A riser: failed joint rectified; straight elements and mono-block joints supplied after factory acceptance testing.
Corrective & preventiveQNB Al-Mathaf Tower1200 A riser: ≈90 °C joint found by thermal inspection; joints and sections re-insulated, riser re-torqued, ≥5 GΩ on Megger.
ModificationDoha Festival City — ShowroomThree risers (1600 / 3200 / 2000 A) re-routed and modified; ≥250 MΩ all phases.
PreventiveAbdullah Abdulghani Commercial TowerRiser-wide rectification of corrosion; tap-off handles and hardware renewed across 23 floors.
RectificationQatari Diyar Building — LusailStraight-section re-insulation; Megger testing and commissioning.
RectificationInterContinental Hotel — DohaStraight-section re-insulation and full insulation tape replacement.
RectificationAl Fardan Building — DohaEnd-cap renewal and joint insulation treatment.
RectificationMall of Qatar — Al RayyanJoint inspection, cleaning and insulation tape replacement.
PreventiveTornado Tower — West BayFull riser preventive maintenance with thermal inspection and Megger testing.
PreventiveWest View Residence (CBQ)Thermal scan, joint inspection, re-torquing and as-left documentation.
PreventiveThe Gate MallThermal imaging, re-torquing, insulation check and tap-off inspection.
ModificationThe Eighteen Tower — LusailAdditional tap-off unit designed, fabricated and commissioned.
ModificationMinistry of Culture Tower — West BayCustom tap-off unit to match the existing specification.
InstallationAl Shahd Tower — West BayRiser installation, alignment correction; Megger check and commissioning.